Specification Support From First Drawing to Final Sign-Off
We work directly with architects and specifiers from early design stage through to technical submission. Send us your drawings — we'll develop coordinated profiles, coordinate key junctions and provide everything you need for approval.
We also run a CPD presentation for practices — no obligation, just useful technical grounding.
Send your general arrangement drawings and section details.
We develop a coordinated profile proposal with key junctions identified and coordinated.
Full technical package for approval and NBS specification.
Delivery scheduled to the agreed programme. Standard lead time is typically 2–3 weeks from approval of drawings and confirmed order. Large or complex bespoke orders may take longer; programme is confirmed at quotation.
Everything You Need for Specification and Approval
Profile Development
Choose from our standard profile families or have a bespoke profile developed directly from your project drawings.
Junction Coordination
Key returns, angles and terminations are coordinated before manufacture, with project schedules showing the relevant junction and fixing requirements.
Technical Submittals
Shop drawings, section details, fixing specifications and project-specific substrate/interface information — packaged for client and contractor approval.
NBS Specification Support
Specification wording for NBS Chorus or equivalent. We provide profile drawings, DXF files and technical information for inclusion in contract documents.
Factory Coating System
Profiles are factory coated with the Taylormade VPI polymer-modified basecoat system. Substrate, fixing and adjoining-finish interfaces are confirmed at technical-submittal stage for the specific project.
Single Point of Contact
One person responsible for your project from initial enquiry through to delivery. Technical continuity throughout the design and procurement process.
We Work the Way Architects Work
We work with standard profile families, adapted standard sizes or fully bespoke details developed from project drawings — supporting less compromise, fewer site adjustments and better continuity with the architect's design intent.
Drawing-Led Process
Standard and bespoke profiles coordinated to suit your GA drawings and project details.
UK Manufacture
In-house CNC production in Aberdare — tight tolerances, consistent quality.
No Minimum Order
Single profiles to full-scheme packages. One-off bespoke or repeat orders.
Why Taylormade Facades
- Fast lead times: typically 2–3 weeks from drawing approval
- Drawings back in 5–10 working days, depending on project complexity
- Free finish samples within 5 working days
- Supply only, moulding installation, render and external wall insulation, or the complete facade package from one team
- Published technical details: fixing details, NBS specification clauses and installation guidance, ready to specify
- Engineered from your GA drawings and CNC-manufactured in Aberdare
- Family-run specialist since 2003
Start a Specification
Send us your drawings and we'll develop a coordinated profile proposal for your review.